Installing QUAZITE® pads is easy
and cost effective because it requires no special equipment
to set the pad. A backhoe is all that is necessary to lift
the pad into place. QUAZITE® pads also save time during
installation. Unlike poured-in-place pads that can take hours
or days to form, pour, set and remove the forms, QUAZITE® pads
can be installed in a matter of minutes and installation
of electrical equipment can begin immediately after the pad
is set.
The optional SPLITT-PAD® design makes retrofit
installations easy and eliminates the need to disconnect service
during installation. Simply break away the old concrete or
other material underneath the equipment cabinet and slip the
SPLITT-PAD® underneath. Complete the installation by bolting
the two-piece pad together at the throat. For more detailed
instructions on how to install the SPLITT-PAD® and other
QUAZITE® pads, CLICK
HERE.

Pad Installation Comparison
| Performance
Criteria |
QUAZITE® Precast
Polymer Concrete Pads |
Precast
Concrete Pads |
Poured-in-Place
Concrete Pads |
Thermoplastic/
Fiberglass Pads |
| Easily installed in areas with
limited accessibility |
X |
|
|
X |
| Minimal planning and scheduling
of crews required for installation |
X |
|
|
X |
| No special equipment (such as
a boom truck or crane) needed for installation |
X |
|
|
X |
| Easily installed by no more than
two crew members (light weight) |
X |
|
|
X |
| Equipment and pad can be easily
installed in the same day |
X |
X |
|
X |
| Available as a two-piece pad
so that service does not have to be disconnected when
retrofitting |
X |
|
|
X |
| Flat surface allows cabinet to
fit flush with the pad |
X |
|
|
|
CLICK
HERE to Learn the Pad Numbering System
Installation Drawings / Specifications:
Telecommunications
Cabinet Pads
Cell
Site Enclosure
RETURN
TO SELECTION GUIDE
TOP |